VA Interest Rates VA loan Application Denver Realtor
First Inspection Stage Alternatives |
VA will notify builders, lenders, and inspectors which of the following first stage inspection alternatives are to be used in specific areas: · Excavation complete and ready for footings and foundations usually applies in localities where it is advisable to have the bearing soil examined before construction proceeds, or · Foundation walls complete and ready for backfill usually applies where soil conditions are generally uniform and free of faults likely to cause foundation problems. |
Completion of Excavation Alternative |
For the completion of excavation alternative, VA inspects · display of VA Poster 26-83-1, Equal Employment Opportunity is the Law · the nature of the bearing soil · form work for footings or the condition and quality of the footing trench if forms are not required, and · compliance with construction exhibits and VA Minimum Property Requirements regarding - the location of the structures on the plot, and - depth of excavation and its relation to street and proposed finish grades and to grades of adjoining improved properties. |
Completion of Foundation Alternative |
For the completion of foundation alternative, all of the above items will be observed and reported. In addition, VA will inspect · the size, location, and condition of all footings, foundation walls, piers, and other supporting members, and · the quality of materials and workmanship of masonry, damp proofing, and foundation drainage. |
Continued on next page
VA
Pamphlet 26-7, Revised
Chapter 14: Construction
Inspections