_____14.
ENERGY EFFICIENT CONSTRUCTION.
Builder's certification which identifies this new dwelling and states
that it was constructed to meet the energy conservation standards of the
Council of American Building Officials (CABO) 1992 Model Energy Code (MEC).
_____15.
LEAD/WATER DISTRIBUTION SYSTEM.
Builder's certification which identifies this new dwelling and states
that the solders and flux used in construction did not contain more than 0.2
percent lead and that the pipes and pipe fittings used did not contain more
than 8.0 percent lead.
_____16.
OFFSITE IMPROVEMENTS.
Evidence that the streets, sidewalks, drains, water, sewer, etc. have
been completed and accepted for maintenance by the local authority.
_____17
PROPOSED CONSTRUCTION.
To be completed based on construction exhibits identified as ____[model
name; or type of construction, square footage, # rooms, # bedrooms and #
bathrooms]______
_____18.
CONSTRUCTION INSPECTIONS.
By VA fee compliance inspector (_________[name]__________) or
HUD fee inspector (with prior VA approval).
_____ Only a final inspection is required if local building authority
inspections are acceptable to VA, or if builder to provide you with a ten-year
insured protection plan acceptable to HUD.
_____19.
CONSTRUCTION WARRANTY. One-year
VA builder's warranty on a fully completed VA Form 26-1859, Warranty of
Completion of Construction.