VA Interest Rates VA loan Application Denver Realtor
|
Table of NOV Conditions & Requirements (continued) |
|
NOV Item |
Instructions for Preparing the NOV |
|
Energy Efficient Construction |
Check this item if the property was appraised as “new construction.” The certification is required even when State or local energy-related requirements exceed the 1992 Council of American Building Officials (CABO) Model Energy Code (MEC) standard. The certification is not required if the dwelling is either · manufactured home built to HUD code and inspected by HUD in the factory, or · individual unit in a condominium over two stories high. References: · Item 14 of the NOV · Section 12.02. |
|
Lead/Water Distribution System |
Check this item if the property was appraised as “new construction.” This requirement also applies to cases involving alterations, improvements or repairs to the potable water distribution system. Reference: See Item 15 on the NOV. |
Continued on next page
January 1, 2001 13-19
VA
Pamphlet 26-7, Revised
Chapter 13: Value
Notices